Find an RV that actually fits your truck.
Research before the dealership Compare RV's
Watch Tour
Step 1 Select Vehicle
Step 2 Select RV
Step 3 Add Gear
Go
Garage
Find an RV that fits your truck
Free tools — research before the dealership
Free
Find an RV that fits your truck
Free tools — research before the dealership
Search every RV made — not just what's on a dealer lot. Check if your vehicle can tow it, add your gear, and see if you're over the limit.
Step 1
Select Your Vehicle
What are you towing with?
Step 2
Select Your RV
What are you looking to tow?
Step 3
Add Your Gear
Does it put you over the top?

Loading...

Loading...

Open Full Calculator

Customize passengers, water, propane, and gear items in the full calculator.

Loading presets...

No gear presets yet.

Create in Calculator

Loading...

Loading...

Loading...

Loading...

Save Your Build

Create a free account to save your vehicle, RV, and gear combinations.

Save Build

2015 Cruiser RV Shadow Cruiser S-195wbs Specs

GVWR
HITCH
470 lbs
DRY
3,920 lbs
Full Specs
1

Can Your Vehicle Tow This?

Enter your vehicle to check manufacturer-rated limits

Loading your garage...
2

Get Your Real Numbers

Tow rating is one limit — payload is what overloads first

The full calculator factors in:
Tongue weight vs payload
Water tanks (50 gal = 417 lbs)
Propane (40 lbs full)
Passengers in truck
Gear, bikes, coolers, tools
Cargo weight distribution
Your truck's payload limit carries tongue weight, passengers, and everything in the bed — that's the number that overloads first. The calculator checks both tow and payload with real gear weights.

Specifications by Category

View specs, shop products, or tap "More" for details.

Towing & Dimensions

Specs
Buy Now
More
Dry Weight
3920 lbs
Details
Recommended
Buy CURT WD Hitch
4.5
Hitch Weight
470 lbs
Details
Safety Essential
CURT Ball Mount
4.5
Payload Capacity
2150 lbs
Details
Recommended
Coil SumoSprings
4.5
Length
264 in
Details
Recommended
Furrion Backup Camera
4.5
Width
96 in
Details
Recommended
Clip On Mirrors
Exterior Height
125 in
Details
Recommended
Telescoping Ladder
4.5
Interior Height
81 in
Details
Recommended
RV Light Strip
4.4

Tank Capacities

Specs Value Buy Shop All Top 5
Number Of Fresh Water Holding Tanks 1 -
Number Of Gray Water Holding Tanks 1 -
Number Of Black Water Holding Tanks 1 -
Fresh Water Tank Capacity 44 gal -
Gray Water Tank Capacity 38 gal -
Black Water Tank Capacity 38 gal - -
Number Of Propane Tanks 2 -
Propane Tank Capacity 60 lbs -
Specs
Buy Now
More
Number Of Fresh Water Holding Tanks
1
Details
Recommended
RV Water Filter
4.7
Number Of Gray Water Holding Tanks
1
Details
Recommended
Camco Odor Control
4.6
Number Of Black Water Holding Tanks
1
Details
Recommended
Rino RV Tank Rinser
4.5
Fresh Water Tank Capacity
44 gal
Details
Recommended
Fresh Water Tank
Gray Water Tank Capacity
38 gal
Details
Recommended
Grey Water Tank
Black Water Tank Capacity
38 gal
Details
Number Of Propane Tanks
2
Details
Recommended
Propane Tank Gauge
4.4
Propane Tank Capacity
60 lbs
Details
Recommended
30Lb Propane Tank

Heating & Cooling

Specs Value Buy Shop All Top 5
Water Heater Tank Capacity 6 g -
Heater Type Automatic -
Water Heater Pump Power Mode Propane - - -
Specs
Buy Now
More
Water Heater Tank Capacity
6 g
Details
Recommended
RV Tank Water Heater
4.4
Heater Type
Automatic
Details
Recommended
Buy RV Furnace
Water Heater Pump Power Mode
Propane

Living Room / Bedroom(s)

Specs Value Buy Shop All Top 5
Full Size Master Bedroom Closet No - - -
Living Area Location Center - - -
Master Bedroom Door Style Curtain - - -
Master Bedroom Flooring Type Vinyl - - -
Master Bedroom Location Front - - -
Master Bedroom Mirror Doors Yes - - -
Master Bedroom Shades / Curtains Yes - - -
Number Of Convertible / Sofa Beds 1 - - -
Number Of Queen Size Beds 1 -
Number Of Sofas 1 - -
Sofa Material Cloth - - -
Specs
Buy Now
More
Full Size Master Bedroom Closet
No
Living Area Location
Center
Master Bedroom Door Style
Curtain
Master Bedroom Flooring Type
Vinyl
Master Bedroom Location
Front
Master Bedroom Mirror Doors
Yes
Master Bedroom Shades / Curtains
Yes
Number Of Convertible / Sofa Beds
1
Number Of Queen Size Beds
1
Details
Recommended
Queen RV Mattress
4.3
Number Of Sofas
1
Details
Recommended
Tri-Fold Sofa
4.6
Sofa Material
Cloth

Kitchen / Dining

Specs Value Buy Shop All Top 5
Kitchen / Living Area Flooring Type Carpet / Vinyl - - -
Kitchen Location Center - - -
Kitchen Table Configuration Pedestal Table - - -
Number Of Oven Burners 3 - - -
Refrigerator Power Mode Electric / Propane - - -
Refrigerator Size Mid-Size - - -
Specs
Buy Now
More
Kitchen / Living Area Flooring Type
Carpet / Vinyl
Kitchen Location
Center
Kitchen Table Configuration
Pedestal Table
Number Of Oven Burners
3
Refrigerator Power Mode
Electric / Propane
Refrigerator Size
Mid-Size

Bathroom

Specs Value Buy Shop All Top 5
Bathroom Flooring Type Vinyl - - -
Bathroom Location Rear - - -
Number Of Bathrooms 1 - - -
Toilet Type Plastic Top 5
Specs
Buy Now
More
Bathroom Flooring Type
Vinyl
Bathroom Location
Rear
Number Of Bathrooms
1
Toilet Type
Plastic
Details
Buying Guide Top 5 Toilet Type Products
Recommended
RV Toilet with Sprayer Attachment

Exterior

Specs Value Buy Shop All Top 5
Leveling Jack Type Front Manual / Rear Manual - - -
Number Of Axles 2 - - -
Sidewall Construction Fiberglass - - -
Number Of Emergency Exits 1 - - -
Number of Doors 1 -
Door Type Curtain -
Body Material Aluminum - - -
Specs
Buy Now
More
Leveling Jack Type
Front Manual / Rear Manual
Number Of Axles
2
Sidewall Construction
Fiberglass
Number Of Emergency Exits
1
Number of Doors
1
Details
Recommended
Buy New Steps
Door Type
Curtain
Details
Recommended
Buy Door Lock
Body Material
Aluminum

Options

Specs Value Buy Shop All Top 5
Air Conditioning Prewiring Yes -
Battery Power Converter Yes - - -
Bunkhouse No - - -
Cable Prewiring Yes - - -
Heat Prewiring Yes - - -
Interior Wood Finish Yes - - -
Metallic No - - -
Overhead Fan Yes - -
Phone Prewiring No - - -
Power Retractable Slideout Yes - - -
Refrigerator Standard - - -
Satellite Prewiring No - - -
Sliding Glass Door No - - -
Surround Sound No - - -
TV Antenna Prewiring Yes - - -
Wallpaper Yes - - -
Washer / Dryer Prewiring No - - -
Water Heater Tank Bypass Yes - - -
Specs
Buy Now
More
Air Conditioning Prewiring
Yes
Details
Recommended
Buy Furrion 18K Conditioner
Battery Power Converter
Yes
Bunkhouse
No
Cable Prewiring
Yes
Heat Prewiring
Yes
Interior Wood Finish
Yes
Metallic
No
Overhead Fan
Yes
Details
Recommended
Overhead Fan
4.2
Phone Prewiring
No
Power Retractable Slideout
Yes
Refrigerator
Standard
Satellite Prewiring
No
Sliding Glass Door
No
Surround Sound
No
TV Antenna Prewiring
Yes
Wallpaper
Yes
Washer / Dryer Prewiring
No
Water Heater Tank Bypass
Yes

Entertainment

Specs Value Buy Shop All Top 5
Number Of Discs 1 - - -
Speaker Location Interior / Exterior - -
Specs
Buy Now
More
Number Of Discs
1
Speaker Location
Interior / Exterior
Details
Recommended
RecPro Exterior Speakers
4.4

Instrumentation

Specs Value Buy Shop All Top 5
Number Of Radios 1 - - -
Specs
Buy Now
More
Number Of Radios
1

Quick Overview

Specs Value Buy Shop All Top 5
Parent Company Cruiser RV - - -
Year 2015 - - -
Make Cruiser RV - - -
Display Name Shadow Cruiser S-195WBS - - -
Class Travel Trailer - - -
Max Sleeping Count 4 - - -
Number of Slideouts 1 - - -
Specs
Buy Now
More
Parent Company
Cruiser RV
Year
2015
Make
Cruiser RV
Display Name
Shadow Cruiser S-195WBS
Class
Travel Trailer
Max Sleeping Count
4
Number of Slideouts
1

Mint Score

Overall Score
3.0
out of 5
Tow-Ready Score
2.9/ 5
Living Space & Layout
3.2/ 5
Comfort & Features
2.7/ 5
Storage Space
2.5/ 5
Off-Grid & Campsites
3.7/ 5

About the 2015 Cruiser RV Shadow Cruiser S-195wbs

The 2015 Cruiser RV Shadow Cruiser S-195wbs is a travel trailer that sleeps up to 4 people. At 22' 0" in length, this floorplan offers a comfortable blend of living space and towability for families and adventurers alike.

What We Love

Large Pass-Through Storage High Payload Capacity (2000+ lbs) Exterior Speakers Vinyl Flooring Throughout Water Heater Bypass

How We Scored This RV

Our MintRV Rating analyzes over 50 specifications across 5 key dimensions. Each dimension starts at 5.0 points and adjusts based on how this RV's specs compare to others in its class. Below is exactly how we calculated each score for this travel trailer.

Tow-Ready Score
5.8/10
Base Score 5.0
Spec-based adjustments Based on Travel Trailer class averages +0.8
Final Tow-Ready Score 5.8
Living Space & Layout
6.3/10
Base Score 5.0
Spec-based adjustments Based on Travel Trailer class averages +1.3
Final Living Space & Layout 6.3
Comfort & Features
5.3/10
Base Score 5.0
Spec-based adjustments Based on Travel Trailer class averages +0.3
Final Comfort & Features 5.3
Storage Space
5.0/10
Base Score 5.0
Spec-based adjustments Based on Travel Trailer class averages +0.0
Final Storage Space 5.0
Off-Grid & Campsites
7.3/10
Base Score 5.0
Spec-based adjustments Based on Travel Trailer class averages +2.3
Final Off-Grid & Campsites 7.3
About Our Rating Methodology

MintRV Ratings are calculated using verified manufacturer specifications. We compare each RV against others in its class type and weight category. Scores are updated when new specs become available. Learn more about our methodology →

Owner Reviews

No reviews yet. Be the first to share your experience!

Frequently Asked Questions

To safely tow the 2015 Cruiser RV Shadow Cruiser S-195wbs, ensure your vehicle's rated tow capacity exceeds its GVWR of lbs. With a dry weight of 3920 lbs and hitch weight of 470 lbs, most midsize trucks and SUVs can tow it comfortably with a 10-20% safety margin.

This Travel Trailer has a dry weight of 3920 lbs and a GVWR of lbs, giving a payload capacity of 2150 lbs for gear, water, and supplies.

The approximate dimensions are length 264 in., width 96 in., and height 125 in. Always confirm clearances for garages, storage, and campsites.

The Shadow Cruiser S-195wbs includes a fresh water capacity of gallons, black water tank(s), and lbs of propane capacity-ideal for off-grid weekends.

Many Shadow Cruiser S-195wbs owners add a weight-distribution hitch, brake controller, leveling system, and portable generator to improve towing comfort. Solar kits, backup cameras, and upgraded tires are also popular upgrades.

With a GVWR of lbs and dry weight of 3920 lbs, the Shadow Cruiser S-195wbs is light enough for smaller tow vehicles yet rugged enough for light off-road travel. Add solar, extra propane, and a generator for extended off-grid stays.

This floorplan sleeps up to 4 people comfortably - perfect for couples or small families seeking a lightweight, easy-tow Travel Trailer.

The Shadow Cruiser S-195wbs features body construction with sidewalls and 2 axle(s). Its GVWR of lbs ensures strength without excessive towing weight.
?? Tip: Always check your vehicle's specific towing capacity in the owner's manual. Consider payload and tongue weight too!

As an Amazon Associate, we may earn from qualifying purchases. Your price stays the same.

Leave the Noise Behind.
Reconnect Outdoors.

Our mission is to help people make well-informed RV buying decisions, so they can leave the noise and screens behind, reconnect with family, and create unforgettable memories in the great outdoors.

Free tools. No sales pressure. Just better decisions.

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.